And the work must go on

| No Comments | No TrackBacks
They started on the first floor walls - then stopped because they had to wait for more ICF block to come in.
MoreICF.jpg

But we do have the water and sewer lines run to the house. Since it is not a metal water pipe, there is a separate ground wire run along with the water line.
water-and-sewer.jpgwater-ground.jpg

There are two sewer cleanouts in the front yard area. One just as the pipe leaves the house and another where the pipe has a bend downward.
sewer-cleanout1.jpgsewer-cleanout2.jpgsewer-cleanout3.jpg

No TrackBacks

TrackBack URL: http://shunpike.spfld.com/cgi-bin/mt/mt-tb.cgi/26

Leave a comment

About this Entry

This page contains a single entry by Apu published on September 14, 2010 11:59 PM.

Backfill complete was the previous entry in this blog.

First floor walls almost ready to pour is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

  • 2008
OpenID accepted here Learn more about OpenID
Powered by Movable Type 5.02