First floor walls almost ready to pour

| No Comments | No TrackBacks
We're almost ready to pour the first floor walls.
front.jpg

inside-1.jpginside-2.jpginside-3.jpg

firstfloor.jpg

And, if you were wondering (I was), they extended at least the one footer I could see.
footer.jpg

Oh, and if you were wondering what the inside of a lally column looks like...
lallycolumn.jpg

No TrackBacks

TrackBack URL: http://shunpike.spfld.com/cgi-bin/mt/mt-tb.cgi/27

Leave a comment

About this Entry

This page contains a single entry by Apu published on September 21, 2010 11:59 PM.

And the work must go on was the previous entry in this blog.

Ready for a basement floor is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

  • 2008
OpenID accepted here Learn more about OpenID
Powered by Movable Type 5.02