The basement walls, continued

| No Comments | No TrackBacks
Four to five courses of ICF block up, along with much of the bracing. Here's a look at the site today. You can also see the transition from 8" block for the basement walls (below ground) and the 6" blocks for the garage wall (above ground).
site1.jpgsite2.jpg
site3.jpgsite4.jpg

The bracing is also going up. While the ICF blocks interlock, once they are full of concrete they need a little extra help to stay standing upright until the concrete begins to cure and harden.
brace1.jpgbrace2.jpg
brace3.jpgbrace4.jpg

No TrackBacks

TrackBack URL: http://shunpike.spfld.com/cgi-bin/mt/mt-tb.cgi/19

Leave a comment

About this Entry

This page contains a single entry by Apu published on August 11, 2010 11:59 PM.

And the walls start closing in was the previous entry in this blog.

The basement walls, continued again is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

  • 2008
OpenID accepted here Learn more about OpenID
Powered by Movable Type 5.02