The basement walls, continued again

| No Comments | No TrackBacks
A panoramic view. As with all the pictures, click for a bigger view.
BasementPanorama.jpg

The site, from the future front of the house.
Front1.jpg Front2.jpg

And, the site, from the future driveway next to the house (church side).
Side1.jpg Side2.jpg

A close-up of where the beam will sit on the walls, under the front door. And, roughly under the office/living room, a few inches of foam have been removed the entire length of the wall so you can see the plastic ties and rebar. I'm not sure exactly why though.
Beam.jpg FoamAway.jpg

Now that the walls are up, and there is no first floor or stairs yet, the only way into the basement is to "walk the plank" across the opening where we will eventually backfill, over the wall onto the scaffolding setup on the inside of the wall, and then down the ladder into the basement.
WalkThePlank.jpg

Here you can see the vertical rebar sticking up from the top level of ICF block as well as the Simpson Strong Tie connectors that will be used to hold the first floor sub-floor to the walls. Frank ran out of ICF block on-site so he & his crew will be back on Tuesday to finish up the basement walls (everything will end up at the height you see on the right side of the picture), rebar, floor connectors, etc. We will then have a building inspection on Wednesday and, if everything passes, they will pour concrete into the ICF block on Thursday.
Simpson1.jpg Simpson2.jpg

No TrackBacks

TrackBack URL: http://shunpike.spfld.com/cgi-bin/mt/mt-tb.cgi/20

Leave a comment

About this Entry

This page contains a single entry by Apu published on August 15, 2010 11:59 PM.

The basement walls, continued was the previous entry in this blog.

Ready to pour is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

  • 2008
OpenID accepted here Learn more about OpenID
Powered by Movable Type 5.02