Ready to pour

| No Comments | No TrackBacks
We're ready to pour the concrete for the basement walls.

In this panorama picture, you can see the planks used to access the structure, the walkway created just inside the walls and the bracing that supports the walls as the concrete is poured in.
ReadyToPour.jpg

And, if you've been following along, you will remember I mentioned there were places where the ICF block was cut back revealing the cavity for the concrete and the rebar within it. That's so the pilasters can be tied into the wall. Here is the form for one of the pilasters, under the office, and the extra bracing outside that area.
pilaster-inside.JPGpilaster-outside.JPG

No TrackBacks

TrackBack URL: http://shunpike.spfld.com/cgi-bin/mt/mt-tb.cgi/21

Leave a comment

About this Entry

This page contains a single entry by Apu published on August 18, 2010 11:59 PM.

The basement walls, continued again was the previous entry in this blog.

Waterproofed walls, with holes is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

  • 2008
OpenID accepted here Learn more about OpenID
Powered by Movable Type 5.02