First floor walls poured

| No Comments | No TrackBacks
The first floor walls have been poured. Don't have any pictures of the process itself and it doesn't look much different afterwards, unless you look down into the wall cavity which is hard to photograph.

Some wondered how you get concrete down underneath the window bucks. The answer is simple: put a hole in it. As they do everywhere, a concrete vibrator is used to make sure the concrete flows into all the nooks and crannies but you have to get it down into the wall first.

window-buck.jpg

Also, before the poured the walls, holes are cut and PVC or sheet metal sleeves are put in place for all the bigger penetrations (bathroom fans, kitchen exhaust fan, electrical service entrance, etc.) If its a small hole (under two inches in diameter), they'll just use a hammer drill later on. Here we have penetrations for two bathroom fans and one dryer exhaust fan.

penetration.jpg

Wood is good for lots of things on a construction site. One use is to cut it to size and then use it to verify your measurements. In this case, a note on the board indicates it is being used to make sure there is 8 ft. 4 in. between the top of the footer and the bottom of the floor joists. Add 4" of the concrete slab and we have 8 ft. ceilings in the basement.

note-1.jpgnote-2.jpgnote-3.jpgnote-4.jpg

No TrackBacks

TrackBack URL: http://shunpike.spfld.com/cgi-bin/mt/mt-tb.cgi/29

Leave a comment

About this Entry

This page contains a single entry by Apu published on September 29, 2010 11:59 PM.

Ready for a basement floor was the previous entry in this blog.

Studs up is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

  • 2008
OpenID accepted here Learn more about OpenID
Powered by Movable Type 5.02