Pin the foot?

| No Comments | No TrackBacks
Next step: Pin the foot(ers). Another visit for the surveyors, this time marking the footers where each of the corners should be located. The surveyor drives a pin into the concrete at the correct location and, when the masons get ready to build the walls, they use the pins to draw a chalk line so the wall stays straight.

pin1.jpg

pin2.jpgpin3.jpgpin4.jpg

If you could see in the other pictures, it's worth noting the sump pits have covers. Keep stuff from going into the pit now but will also keep radon from coming up later.
sump1.jpgsump2.jpg

We still have our concrete-encased electrode ("Ufer ground") too.

ufer.jpg

Finally, just two pictures from the driveway. One looks over the site (and down into the basement which is entirely below grade) and other shows the pile of wood that used to be the forms for the concrete footers.

site.jpgwood.jpg

No TrackBacks

TrackBack URL: http://shunpike.spfld.com/cgi-bin/mt/mt-tb.cgi/17

Leave a comment

About this Entry

This page contains a single entry by Apu published on August 3, 2010 11:59 PM.

Draining was the previous entry in this blog.

And the walls start closing in is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

  • 2008
OpenID accepted here Learn more about OpenID
Powered by Movable Type 5.02