I've been remiss

| No Comments | No TrackBacks
I've been remiss. Lots of work done but I haven't had time to take the pictures or post updates. The second floor walls were poured, the basement floor was poured, the second floor interior walls and attic floor were built and here you can see that the roof was framed and sheated as well.
front-1.jpgfront-2.jpgfront-3.jpg

No TrackBacks

TrackBack URL: http://shunpike.spfld.com/cgi-bin/mt/mt-tb.cgi/33

Leave a comment

About this Entry

This page contains a single entry by Apu published on November 13, 2010 11:59 PM.

Second floor walls and front steel was the previous entry in this blog.

And the roof goes on is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

  • 2008
OpenID accepted here Learn more about OpenID
Powered by Movable Type 5.02