It's not all concrete

| No Comments | No TrackBacks
Up until now, all the wood was temporary. Temporary electric service. Forms for the footers, or braces for the ICF walls. But we are up to the point where we use real wood. Granted, most of it is engineered but that's still okay.

Due to the rain, we got the delivery but not much else happened. Mostly wood, mostly engineered, though there is some "plain" wood and some steel lally columns.

lumber0.jpglumber1.jpglumber2.jpg

lumber3.jpglumber4.jpglumber5.jpg

No TrackBacks

TrackBack URL: http://shunpike.spfld.com/cgi-bin/mt/mt-tb.cgi/23

Leave a comment

About this Entry

This page contains a single entry by Apu published on August 23, 2010 11:59 PM.

Waterproofed walls, with holes was the previous entry in this blog.

First floor - done! is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

  • 2008
OpenID accepted here Learn more about OpenID
Powered by Movable Type 5.02