Feet on the ground

| No Comments | No TrackBacks
Frank and his crew (Franks Insulated Concrete Forms & Building Systems) have been busy getting the wooden forms ready to hold the concrete that will make the footers upon which the house will sit. Unfortunately, we lost a day as he originally built the forms with overlapping boards (left picture) and the building inspector would not approve that. So, he had to redo his work with butt joints (right picture).

Overview1.jpgOverview2.jpg

There are two courses of rebar throughout the continuous footers, held in the right location using rod chairs, overlapping each other and tied together with steel tie wire.

RebarPlaced.jpgRodChair.jpg

Here is where the drywell used to be located, as well as a closeup of one of the piers.

DryWellOverview.jpgDryWellCloseup.jpg

CloseupPier.jpg

A few more pictures to give you a general overview of the site.

Overview3.jpg

Overview4.jpgOverview5.jpg
Overview6.jpgOverview7.jpg

Finally, in case there was any doubt, we did pass our footing inspection. To make sure we knew, the inspector found a convenient spot for the sticker.

FooterInspection.jpg

No TrackBacks

TrackBack URL: http://shunpike.spfld.com/cgi-bin/mt/mt-tb.cgi/11

Leave a comment

About this Entry

This page contains a single entry by Apu published on July 26, 2010 11:59 PM.

Measure twice was the previous entry in this blog.

The Ufer Ground is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

  • 2008
OpenID accepted here Learn more about OpenID
Powered by Movable Type 5.02